Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13690956

- Product Categories
- Friendly Links
Information Name: | Unloader |
Published: | 2015-04-24 |
Validity: | 365 |
Specifications: | |
Quantity: | 1000.00 |
Price Description: | |
Detailed Product Description: | Unloader unloader is made using a continuous conveyor machinery can enhance head granular material, or both self reclaiming capacity, or with reclaimer, feeding device, the granular material continuously raise the cabin, then uninstall the arm or rack and can be transported to the shore where the main transport system to send special machinery. Use unloader can greatly improve the discharge efficiency, minimal dust pollution can keep the environment clean, efficient and environmentally friendly. Features Features unloader highest operational safety simple mobilize less maintenance workload efficiency to reduce losses largest component standardization minimal dust and noise constitute unloader consists of the following mechanical components: 1) carts travel agencies 2) car 3) Grab 4) boom tilt mechanism 5) moving cab, boom tilt control room and a second electrical control room 6) funnel 7) feeding belt conveyor 8) coal falling outside agency to return the bezel and 9 ) lifting, opening and closing, and car traction mechanism 10) sprinkler system pressure dust 11) lifts, ladders, platforms, trails 12) power, control cable winder 13) anchoring, mooring typhoon wind 14) mechanical, electrical Room 15) and traction systems Tuosheng car 16) maintenance crane to start checking before (a) boarding a job, you should first check within walking track and unloaders range of movement whether the workers and obstructions; check anchoring devices, anti-climb iron wedge, wind cable and Wheel Clamp are complete, intact, anchoring devices should be lifted, wind cables, anti-climb iron wedge so that in the non-anchor state. (B) the shift gate, boarding along the route should be checked for confirmation unloader. Check the main cable for distortion, trauma and other fixed place of loose; check funnel system is intact; check for wear Grab connection security situation and grab the rope, abnormal should be promptly reported treatment (three) wire rope and wire rope inspection Are the joints normal; if loose, you should tighten handle. (Four) on the front and rear beam unloader check to make sure the main car, if there is an obstacle in the Tuosheng trolley tracks and moving range, trolley tracks without exception. (E) Check the opening and closing mechanism and lifting Tuosheng trolley wire rope tensioning mechanism, brake wear each piece. (F) Check unloader lubrication lubrication points, check the fuel tank, gear oil, etc. whether the requirements. (Vii) Check the drive, the drive mechanism and working mechanism, electrical wiring, electrical equipment and protective equipment, hydraulic equipment, and whether it is operating actuator Note 1) operating linkage Taiwan's two handles on each plate were moving direction stalls bits to control the speed of change in action agencies, while the linkage table is also equipped with horn button, single selector switch and emergency stop buttons, emergency stop button is used when the event of an emergency stop, the remaining lights and buttons are the nameplate be logo. 2) in front of the driver, there are two pedals, left foot switch rotary jog right is the single foot. 3) Prior to the advent of weather forecasts in case of high winds on the need to open the crane to anchor the top of the pit, the anchoring device anchored into the anchor hole. 4) Always check the anchoring device reliability. |
Admin>>>
You are the 5602 visitor
Copyright © GuangDong ICP No. 10089450, Building Material Technology Co., Ltd. Nantong Australia All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 5602 visitor
Copyright © GuangDong ICP No. 10089450, Building Material Technology Co., Ltd. Nantong Australia All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility